Step 2: Upload Footing Takeoff

July 10, 2026

Soil Boring

2

Takeoff

3

Design

Step 1 Complete
Soil Boring Data

Project: Not specified

Boring #: 1

Soil Layers: 4 layers

Groundwater: 10.0 ft


View Soil Data
Upload Footing Takeoff CSV

Drag and drop your CSV here, or click to browse

No file selected

Expected CSV Format

Your CSV should have the following columns:

footing_type, name, footing_count, footing_lineal_feet, length, width, depth_of_foundation, bearing_pressure, load

footing_type: isolated, continuous, combined, mat
name: Footing identifier (F1, WF1, etc.)
footing_count: Number of footings (for isolated)
footing_lineal_feet: Length (for continuous footings)
length, width, depth_of_foundation: Dimensions in feet
bearing_pressure: Allowable bearing pressure in psf
load: Optional - specify load directly in kips

Back to Step 1